What is MasterFormat construction?

MasterFormat is a coding system for organizing construction documents, contracts, design specifications, and operational manuals. It uses specific numbers and associated titles that make up a universal indexing system.

What are the 16 divisions of construction?

The following are the sixteen divisions listed in the Master Format 1995 Edition.

  • Division 01 — General Requirement.
  • Division 02 — Existing Conditions.
  • Division 03 — Concrete.
  • Division 04 — Masonry.
  • Division 05 — Metals.
  • Division 06 — Wood and Plastics.
  • Division 07 — Thermal and Moisture Protection.

What is the Construction Specifications Institute CSI MasterFormat?

MasterFormat is the master list of titles and numbers used to organize specifications and other project information for most commercial building design and construction projects in North America. It lists titles and section numbers for organizing data about construction requirements, products, and activities.

What is CSI architecture?

www.csiresources.org. The Construction Specifications Institute (CSI) is a United States national association of more than 8,000 construction industry professionals who are experts in building construction and the materials used therein.

How do you write architecture specifications?

Specifications are the written requirements for a material, product, or service for a proposed project, like a building, bridge or machine. For architectural projects, the specifications are art of the Contract Documents included with the bidding and construction requirements and the drawings.

What are the main components of a project specification?

The primary components of a project management plan are:

  • Scope Statement.
  • Critical Success Factors.
  • Deliverables.
  • Work Breakdown Structure.
  • Schedule.
  • Budget.
  • Quality.
  • Human Resources Plan.

What is an outline design?

Outline design implies sketches, depicting the outer edges of an object or element without any interior details or shading.

What is a specification section?

Facilitates coordination of project documentation within a project manual. DEFINITIONS: … Divisions form the framework of a project specification. Section: A portion of the specifications covering one or more segments of the total project. Sections are included in a project manual as needed to meet project requirements.

How do you write a specification?

How to write specifications for a project: A few tips

  1. Specification document should be simple. Nobody needs to write a 20-page specification from scratch. …
  2. Project description. …
  3. List of all the pages/screens with all the features. …
  4. User path. …
  5. Design mockups or wireframes. …
  6. Tech stack related information.

Who writes construction specifications?

Architects or designers create construction specifications before work actually starts. But many involve project engineers for technical help. In every construction project, there are three types of construction specifications.

What are the three parts of each technical specification section?

Each specification section is divided into three parts. These parts are Part 1–General, Part 2–Products, and Part 3–Execution. Each part includes particular information about the subject of the section. These three parts are fixed in number and title and are included in all specification sections.

What are technical specifications in construction?

Technical specifications (specifications) are defined by ASTM International as “an explicit set of requirements to be satisfied by a material, product, system, or service.” Specifications effectively draw the line between what is recommended and what is required.

What is a modern method of construction?

Modern Methods of Construction‘ (MMC) is a wide term, embracing a range of offsite manufacturing and onsite techniques that provide alternatives to traditional house building.

What are construction methods?

Construction methods are the procedures and techniques that are used during the building process. Designing Buildings Wiki has many articles on different types of construction method: … Base construction.

What is the fastest construction material to erect?

Onsite construction can certainly begin more quickly when you are using concrete, stone, or brick. However, total construction time will lag behind that of building with steel.