What division is Millwork in construction?

Division 6

What is the difference between Masterformat and Uniformat?

The differences between two the formats is that Masterformat organizes the building design by the material of the project. The Uniformat is a method that organizes the building design in a way that links the systems of the project.

How does the Masterformat help all participants in the industry to communicate?

It is the most common standard for organizing specifications for commercial and institutional buildings in the United States and Canada, because it helps improve communication between members of the design and construction team by providing a master list of numbers and titles to organize project manuals and detailed …

What is a complete set of construction drawings?

TYPES OF DRAWINGS. A complete set of house plans usually contains floor plans, elevations, sections and “details” that together form a detailed picture of the entire house.

Do specifications overrule drawings?

Most construction contractors understand that Federal Acquisition Regulation (“FAR”) Specifications and Drawings for Construction, specifically states that “in case of difference between drawings and specifications, the specifications shall govern.” This clause is mandatory for use in fixed-price …

What are plans and specs?

Your house plans are a set of scaled drawings that show contractors what they are building. Your specifications (or specs) are a written document that details what materials will be used and how to install things.

What takes precedence in a contract?

Order of Precedence A good starting point when an ambiguous or conflicting provision exists within a contract is to check the order of precedence typically set out within the document. This order of precedence will rank documents of the contract such that it should be clear which documents take precedence.

What is the relationship between the working drawings and the technical specifications?

The working drawings usually contain information relative to design, location, dimensions, and construction of the project, while the technical specifications are a written supplement to the drawings and include detailed information pertaining to materials and workmanship.

What is the difference between working drawings and construction drawings?

These drawings are implemented on the design stage itself. Architectural Construction Documents also known as working drawings are those drawings that are prepared by designers and architects to visualize the architectural components placed in building or structure before the construction process begins.

What types of drawings are used in construction?

Types of drawings for building design

  • As-built drawings and record drawings.
  • Assembly drawings.
  • Block plan.
  • Component drawings.
  • Concept drawings/sketches.
  • Construction drawings/working drawings.
  • Design drawings.
  • Detail drawings.

What is the importance of developing a working drawing before construction?

The primary role or function of working drawings is to convert design data into construction information and to clearly communicate that information to building industry, code officials, product manufacturers, suppliers and fabricators.