What division is landscape?

Division 32 – Exterior Improvements – Fencing and Landscaping.

What type of business is construction?

Generally, there are five main entity types: sole proprietorships, limited liability companies (LLCs), partnerships, S corporations, and C corporations. The most common of these for construction contractors are LLCs, partnerships, S corporations, and C corporations.

What is the name of the official document that notifies the contractor to start construction?

What is the name of the official document that the owner uses to notify the contractor to start construction? The document used to officially inform the contractor to proceed with the contract is called a notice to proceed. Name the two primary selection criteria categories considered when using the best-value method.

Which procurement method is the most commonly used today?

Traditional procurement remains the most commonlyused method of procuring building works. It comprises a tripartite arrangement involving a client, consultants and a contractor. The traditional procurement route involves separating design from construction.

What are the types of procurement methods?

The principal procurement methods are:

  • General contracting;
  • Design and build;
  • Construction management; and.
  • Management contracting.

What is a contractor submittal?

Submittals consist of information provided by the contractor to the design professional for approval of equipment, materials, etc. before they are fabricated and delivered to the project. Submittals can be presented in various formats, such as shop drawings, cut sheets on equipment, and material samples.

What are RFI submittals?

An RFI, which means (depending on whom you ask1) either Request for Information or Request for Interpretation, is intended to clarify, within reason, the design intent of the documents.

What is a RFI in construction?

In construction, a request for information (RFI) seeks the clarification of plans, drawings, specifications, and agreements. The construction RFI is a formal written process in which parties, such as the contractor and designer, clarify information gaps in construction documents.

What is a submittal package in construction?

Submittals are those shop drawings, product data, samples, and mock-ups to be delivered to the design professional (the architect or engineer) for review and action as required by the contract documents. Various types of submittals are part of the construction process.

What is a submittal package?

A submittal package is a collection of submittal items grouped together by the contractor to expedite the approval process. … The submittal coordinator should review and update the status of all items before submitting the package back to the contractor. To create a submittal package. Go to the Submittal Packages page.

How do I create a submittal package?

Steps

  1. Navigate to the project’s Submittals tool.
  2. Click +Create > Submittals Package. …
  3. In the ‘General’ tab, complete the data entry in the ‘General Information’ area as follows: …
  4. If you want to add one or more existing submittals to this package, see Add an Existing Submittal to a Submittal Package.

Is a submittal a contract document?

Submittals are not contract documents. The contractor prepares submittals, and the architect prepares contract documents. A201 states: 3.